In modern geotechnical construction, increasing the bearing capacity of the bases is always a pressing issue. The employment of established solutions to ensure the sustainability of current restrictions is not always justified with growing external demands. It is frequently necessary to use non-standard reinforcement methods. Existing reinforced concrete retaining structures are frequently used to support new additional loads from newly developed facilities. In such instances, the employment of EDT drill-injection piles enables for the resolution of difficult geotechnical issues related to prospective base reinforcement.